Show Notes

It isn’t as smooth as I’d like, but the moment Francois kicks the stage represents about 1 hour of time spent during which I attached the upper stage to the lower stage. Connecting the upper stage was challenging enough for me, so it would have taken a silly amount of time to create footage of the pipe cleaner guys doing it.

Here are today’s livestreams:

  1. https://www.youtube.com/watch?v=qpeHQqscrnA up to when I let the glue dry on the circle-drawer after adding a new piece to make it a drill guide

  2. https://youtu.be/oRRCVZZBqQg during which I drill pilot holes in the top piece, screw it to the rotating plate and try to align it so Francois seems to kick it into place

I have spent 64+ hours on MT3 so far.

20:14 Sunday 24 September 2017 JST

Make that I have spent 65 hours on MT3 so far.

livestream of me trying to find marbles and test rolling the marble on the platform https://www.youtube.com/watch?v=P-zcUDDdGQc