Show Notes

In just a bit over an hour, I got the Triple Splitter Small Feeder Inner Bar moved and glued in place. During this time, Big Brother pushed the large red marble into the snakes, which has set them into motion. Backpack Jack is bringing the Triple Splitter Small Feeder Outer Bar Lower Support up the ramp, and Mr Greene is clearing the landing zone below the Lower Zig Zag.

I turned off the livestream once I glued the tssfib in place, and then realized I could get a jump start on next livestream by bending and gluing the Triple Splitter Small Feeder Outer Bar. So I glued Triple Splitter Small Feeder Outer Bar in 11 minutes

Frames from today:

00010 002 10 X1 0498 00010 002 10 X1 0499 00010 002 10 X1 0500 00010 002 10 X1 0501 00010 002 10 X1 0502 00010 002 10 X1 0503 00010 002 10 X1 0504