Show Notes

Today’s livestream was over two hours, during which I got 9 frames taken. I spent most of the time planning the next few pieces.

The position of Caret Splitter Rudder seems like it will work, though I do not yet know how I will toggle its direction.

Lower Zig Zag 3F will possibly be the name of the third (from bottom) 9.4cm bar of the Lower Zig Zag. Its upper support, Lower Zig Zag 3F Upper Base will be supported by 2 of the toothpicks making up the Lower Zig Zag Net. These two toothpicks will be the Lower Zig Zag 3F Upper Base Base

I made a Demo Lower Zig Zag 2F top which will show future me what the characters should build to ensure the small marbles roll down while not interfering with the large marbles on the Triple Splitter.

Reversible Guy is coming with pieces to make the real Lower Zig Zag 2F top right now.

00010 002 10 X1 0569 00010 002 10 X1 0570 00010 002 10 X1 0571 00010 002 10 X1 0572 00010 002 10 X1 0573 00010 002 10 X1 0574 00010 002 10 X1 0575 00010 002 10 X1 0576 00010 002 10 X1 0577

19:27 Friday 03 May 2019 JST

Okay well I did another livestream today, Reversible Guy carries new track pieces in which Reversible Guy carries some new track pieces while Little Brother finishes his double backroll and Super Spoony delivers 2+1 small marbles to the Triple Splitter Small Feeder. Oh and Mr Greene placed a 9.4cm bar up where he thinks it will go, but not where it will actually go. I will tack it to the stage with a teeny bit of glue.

Here is the latest video snippet; I added about 1 second since the last one.

Here are the 8 frames taken during the second livestream.

00010 002 10 X1 0578 00010 002 10 X1 0579 00010 002 10 X1 0580 00010 002 10 X1 0581 00010 002 10 X1 0582 00010 002 10 X1 0583 00010 002 10 X1 0584 00010 002 10 X1 0585